Routing the Tri-Light/Lane Light Cable on a Convertible unit
To route the Terminal Display cables, follow these steps:
- Raise the Tower Frame assembly.
- Do the following:
- From the Tower Frame pole duct, route the Tri-Light/Lane Light cable down through the built-in hooks inside the Tower Frame down the center of the Scanner bed.
- Route the cable down through the spiral cable manager the floor of the Scanner/Scale bucket.
- Secure the cable to the spiral cable manager at every notch using cable ties.
- Secure the cable to the anchor using a cable tie.
- From the corner cable access hole, route the cable down the Core Cabinet wall and connect to the I/O Box (Tri-Light/Lane Light port). Use cable ties to secure the cable on bridge lances.Note
For the Tri-Light/Lane Light with Camera Assembly, connect the Camera Power cable to the I/O Box (Input Belt port).