Routing and Sorting Cables

To route the cables in the R6 Lite unit, follow these steps:

1.Install all R6 Lite components.

2.Remove and sort existing 7350 cables. For more information, refer to Removing and Sorting Cables.

3.At the back of the unit, identify and ensure that only three cables are coming out from the bagwell, as shown below.

Note:  If upgrading to 7360 (R6) Tri–Light/Lane Light, unplug the 7350 (R5) Tri–Light/Lane Light power cable from the power strip and then discard.

4.If R6 Lite cables are not yet routed in the unit, do the following:

Route the Display cables. For more information, refer to Routing NCR 7702 Terminal Display Cables.

Route the I/O Box cables. For more information, refer to Routing I/O Box Cables.

Route the System Power Supply cables. For more information, refer to Routing System Power Supply Cables.

Note:  For more information about routing cables, refer to the SCO Release 6 Lite Cable Routing Instructions (497-0519586).

5.At the back of the unit, identify and then group the cables using cable ties.

Example:  Group cables that are connected to the Display and group cables that are connected to the I/O Box.

Note:  For easier removal, do not include the Tri–Light/Lane Light cable in the bundle.

6.Place additional cables that cannot be bundled properly in the lower section of the cabinet as shown in the image below.

7.Install the back panel cover to the NCR SelfServ Checkout unit.