Routing System Power Supply Cables

To route the System Power Supply cables, follow these steps:

1.Install the I/O Box and Power Supply Bracket to the NCR SelfServ Checkout Narrow Core unit. For more information, refer to Installing the I/O Box and Power Supply Bracket.

2.Using cable ties, secure the cables on the corresponding lance bridges to fix the cables on Power Supply mount as shown in the image below.

3.Using cable ties, group the cables exiting to the back of the unit.

4.Do any of the following:

Install other R6 Lite components. For more information, refer to the Installation Procedures.

Route and sort cables. For more information, refer to Routing and Sorting Cables.

Note:  For more information about routing cables, refer to the SCO Release 6 Lite Cable Routing Instructions (497-0519586).