Routing Input Belt Cables

To route the Input Belt cables through the SelfServ Checkout Core Cabinet, follow these steps:

  1. Install the Input Belt to the SelfServ Checkout. For more information, refer to Installing the Input Belt assembly.
  2. Do the following:
  3. Route the Input Belt DC Power cable to the SelfServ Checkout R6 I/O Box. Depending on the unit orientation, refer to any of the following procedures:
  4. Route the Input Belt AC Power cable to the SelfServ Checkout Power Strip. Depending on the unit orientation, refer to any of the following procedures:
  5. If the Input Belt comes with an AC Junction Box, route the AC Junction Box cable through the SelfServ Checkout and out to the store’s power pole. Depending on the unit orientation, refer to any of the following procedures: